The stainless steel top should be fixed with the help of pop revits in slush position. The heavy duly insertable plastic shoes should be provided.
Finish: All components should be pretreated in seprate eight tank process for better finish good adhesion and corrosion protection. Process includes hot degreasing, Derusting, activation, phosphating & No's of water inses as per IS 3618-1966 class 'C' type and then pretreated materials is coated with epoxy powder with film thickness of 60 microns (approx) and than oven backed at 180 degree centigrade
. |